Flower Clock Concept · evidence programme

Gadkhali–Jhikargacha · Jashore

FRiO

The proposed study will measure where flowers lose quality and value between harvest and buyer acceptance, before cold-chain equipment is selected.

Context image · Jhikargacha, Jashore · Muhammad Amdad Hossain / Wikimedia Commons, CC BY-SA 4.0

Six handoffs from harvest to buyer acceptance: harvest, handle, treat, hold, dispatch and accept. The hours between them are not yet measured. 01 Harvest02 Handle03 Treat04 Hold05 Dispatch06 Accept06handoffs · harvest → acceptancehours not yet measured
Why Jashore · why measure first

We know where to look. Losses are unmeasured

Jashore dominates recorded flower production. The proposed study will measure changes in condition, time and value along the Gadkhali route.

Load
What volume moves, when, and in what mix?
Time
Where does condition begin to change?
Control
Which handling or treatment preserves acceptance?
Existing capacity
What can already serve the route?

Reported market pattern · not project evidence2025 reporting describes growers arriving before dawn and early-morning wholesale trade, with activity through around 9am. FRiO will measure route times directly.

Bangladesh district flower atlas with Jashore highlightedJashore is highlighted within the Bangladesh district atlas because it accounts for 92.7 percent of recorded 2024–25 district flower production in the governed Crop Intelligence dataset.
Flowers · recorded district productionBangladesh · 64 districts
92.7%of recorded 64-district flower production
Production share92.7%
Area share47.5%
33,341 trecorded Jashore production
588 harecorded Jashore flower area

Production share and area share are separate measures. No yield claim is made.

BBS Yearbook of Agricultural Statistics 2025 · 2024–25 district flower components.

Open Flowers in Crop Intelligence
Harvest to buyer acceptance

Six handoffs, one clock

A handoff is a transfer between growers, handlers, transporters or buyers. Follow the same load through six stages to see what the study records and which decisions those records support.

Hours not yet measured
01 Harvest02 Handle03 Treat04 Hold05 Dispatch06 AcceptHarvest → acceptancehours measured in the corridor study
01/ 06
01 · Harvest window

Starting condition and harvest time

Record species, maturity, condition and harvest timing.

Record

Species, maturity, starting temperature, stem condition and harvest time

Why it matters

Define the acceptable starting condition.

Risk if unmeasured: Over-maturity, field heat, water stress and mixed quality

Test
Harvest window, shade, clean cutting and immediate handling
Existing capacity to check
Cutting tools, shade, clean water and field handling practices

Stage 1 of 6: Harvest

Proposed measurement programme

Repeat the clock across demand periods

Repeat runs until condition and buyer responses are consistent. Each run keeps one record per load, filled in at each of the six handoffs.

01Harvest02Handle03Treat04Hold05Dispatch06Accept
01 HarvestStarting at harvest

Flower type, maturity, quantity, harvest time and starting condition.

02 Handle · 03 TreatWhat changed before dispatch

Grading, hydration, shade, packing, treatment and time spent at each step.

04 Hold · 05 DispatchHow long it waited and moved

Holding time, temperature, loading, journey time and transfer events.

06 AcceptWhat the buyer accepted and paid

Accepted and rejected stems, reason, price, deductions and settlement time.

Proposed repeated study design
Product + market mix

Test more than one flower type across different demand periods.

Load + movement states

Record smaller, typical and peak movement once field volumes establish the classes.

Current + controlled movement

Compare current practice with handling-led and, where justified, active treatment.

Buyer closure

Join acceptance, rejection, price and settlement to each route record.

Commission the evidence programme

What the study must establish

Four workstreams, each ending in one deliverable. Cost shares follow after sites, repeat runs and measurement needs are confirmed.

WorkstreamScopeDeliversHandoffs
01 · Corridor measurementRepeated harvest-to-buyer runs across demand periodsFlower Clock record: harvest through buyer acceptance measured as one commercial journey01–06
02 · Handling + treatmentCurrent practice, handling-led control and justified treatment trialsComparison of handling-led and treatment controls, recorded on the same loads02 Handle · 03 Treat · 04 Hold
03 · Buyer + unit economicsAcceptance, rejection, price and cost per accepted stemBuyer acceptance dataset: condition, rejection, price, deductions and settlement joined to route time06 Accept
04 · Asset audit + mandateUse what works before specifying new capitalExisting capacity audit and the investment decision: only the infrastructure the evidence supportsCapacity at every handoff
Evidence notes

Sources and evidence limits

District evidence
Jashore records 33,340.68 tonnes of flower production and 587.668302 hectares of flower area in the 2024–25 district flower components. Public display rounds these to 33,341 t and 588 ha. Jashore accounts for 92.7% of recorded district production and 47.5% of recorded district flower area. No yield claim is made.
Reported sector context
2025 reporting places core Gadkhali and nearby cultivation at roughly 637 to 650 hectares, depending on source and geography. These reports provide context rather than FRiO project evidence.
Market timing
2025 reporting describes growers arriving before dawn and early-morning wholesale trade, with activity through around 9am. FRiO must measure route times directly.
Existing assets
Government and sector records refer to a Godkhali Flower Market Centre Complex, collection infrastructure and cold-storage capacity. FRiO will verify function, access and route fit.
Technical precedent
A 2025 open-access BAU trial reported a two-ton hybrid horticultural cooler operating near 10.2°C and averaging about 6.79 kWh per day during the trial. It tested fruits and vegetables and does not provide FRiO design assumptions.
Status
Concept · evidence programme. Elapsed hours at each handoff are not yet measured; they are the output of the corridor study.
The decision

No proof, no new equipment

Commission repeated Flower Clock measurements. Add permanent equipment only if buyer response and operating costs justify it.

01 · Use what works

Handling-led

Prioritise existing assets and operating controls when they preserve route condition.

02 · Test added control

Treatment or capacity

Test treatment or corridor capacity only where buyer acceptance and unit economics improve enough to justify the added cost.

03 · Stop capital

No build yet

Do not specify permanent equipment when repeated buyer response and unit economics do not support it.

Current askCommission the repeated Flower Clock measurement study.Funding for permanent cold-chain infrastructure is not currently sought.